1 == Renewal Due Date Extended to Cover Lost Time ==
3 When an item is renewed before it's due date, libraries now have the option
4 to extend the renewal's due date to include any time lost from the early
7 For example, a 14 day checkout renewed after 12 days will result in a due date
8 on the renewal of 14 days plus 2 days to cover the lost time.
12 Two new fields are available under Admin => Local Administration =>
15 *Early Renewal Extends Due Date*
17 Enables this new feature for a circulation policy.
19 *Early Renewal Minimum Duration Interval*
21 Specifies the amount of time a circulation has to be checked out before a
22 renewal will result in an extended due date.
24 For example, if you wanted to support due date extensions on 14-day checkout
25 renewals, but only if the item has been checked out at least 8 days, you
26 would enter "8 days" for the value of this field.
28 If no value is set for a given matchpoint that supports renewal extension,
29 all renewals using that matchpoint will be eligible.